IIoT · Machine Vision · SCADA Retrofit · Delhi NCR
We instrument the factoriesthat already exist.
Retrofit-first automation for Indian manufacturing. We pull data out of machines that were never meant to talk — legacy PLCs, analogue meters, dumb CCTV — and turn it into OEE you can act on by the next shift.
The four pipelines
One floor, four ways in.
IoT Monitoring
- Traceability
- Automated Downtime Capture
- Energy Metering & Condition Monitoring
- OEE Dashboards — Availability, Performance, Quality
Spatial AI
- PPE Compliance
- Loading bay dispatch verification
- Smart CCTV-based SOP adherence
- Facial Recognition
Dashboards
- LMS
- HR / Management Software
- Maintenance Ticketing
- Attendance and Skill Matrix
Industry 3.0 Automation
- Retrofitting Legacy Machines — PLC/SCADA Monitoring
- Barcode & QR Integration
- Panel & Control Updates
- Poka-yoke Fixtures
Most Indian plants already have the machines. What they don't have is the data coming off them.
Downtime on most un-instrumented lines is logged by hand, hours after it happens
— what we see on audits
A machine older than its operator can still report cycle counts over Modbus
— true of most 1990s-onward PLCs
Typical OEE gap between the morning-meeting number and the measured number: double digits
— illustrative
What you actually see
Not a platform demo — the two screens that run a shift.
01 — OEE dashboard
Availability, performance, and quality computed from live machine signals, with the downtime Pareto your morning meeting argues about. Representative interface, illustrative data.
02 — Traceability record
One QR scan pulls the part's whole history — material heat number, station, operator, quality gate, dispatch — the record a customer audit asks for. Proof-of-concept interface, illustrative data.
How an engagement runs
Audit to operate, without stopping the line.
- 01
Audit
2–5 days on site
We walk the floor with your maintenance head, open panels, test comms ports, check camera streams, and map where data can come from.
- 02
Retrofit
2–6 weeks, staged
Gateways, meters, sensors, and scanners go in — machine by machine, in planned windows between shifts.
- 03
Integrate
1–3 weeks, mostly remote
Data starts flowing into dashboards.
- 04
Operate
Ongoing
Monthly on-site reviews for the first quarter, then quarterly.
Why choose us
Four promises we put in the contract.
Retrofit-first
Your machines stay. We add sensing and comms — no rip-and-replace.
Your data, your network
On-premise by default. Cloud only if you ask, and only one-way.
No lock-in
Open components, unlocked PLC programs, cancel software with 30 days' notice.
NCR on-site support
A named engineer, remote same-day, at your plant within 48 hours.
A
We show up before the giants do
The large integrators quote six-figure projects for thousand-machine plants. We work with the 40-machine fastener shop in Faridabad that they will not answer the phone for — and we price so a plant can start with one line and prove the value before spending more.
B
Compliance is pushing this anyway
Customer audits, IATF traceability requirements, energy reporting, and the DPDP Act's rules on biometric data are already landing on Indian plants. Instrumentation you were going to be forced into eventually costs less when it is planned.
C
We sell the shovels, not the gold rush
We are not promising an AI transformation. We install gateways, meters, cameras, and panels — the unglamorous layer every later ambition depends on. Whatever software fashion comes next, it will need the data infrastructure we put in.
Deployment snapshot
What a scope actually looks like.
Representative engagement shapes for plants in our size range. Named references are shared on request once clients agree to be named.
Auto components — sheet metal
In deploymentDowntime capture and OEE on two press lines; energy metering on compressors
- Plant
- 120 machines, 3 shifts
- Timeline
- 6 weeks to full line coverage
Fasteners
In deploymentRetrofit monitoring on cold-forging machines; maintenance ticketing
- Plant
- 40 machines, 2 shifts
- Timeline
- 4 weeks
FMCG packaging
In deploymentLoading bay dispatch verification on existing CCTV; PPE zones in the plant
- Plant
- 8 lines, 300 staff
- Timeline
- 2-week pilot, 6-week rollout
Wiring harness
In deploymentAttendance, skill matrix, and LMS with line-side kiosks
- Plant
- 600 operators
- Timeline
- 5 weeks to first module
Your machines have been talking this whole time. Start listening.